John's Blog
A glimpse into the life of a husband, father, & weekend warrior
  • Home
  • Projects
  • Bike Races
    • Addison Oaks Fall Classic
    • Assenmacher 100
    • Barry Roubaix
    • Hart Hills Gravel Race
    • Iceman
    • Island Lake Challenge
    • Island Lake Induction
    • Lowell 50
    • Maple River Gravel Grinder
    • Michigan Mountain Mayhem
    • Ore to Shore
    • Peak 2 Peak
    • Sweat Shaker
    • Yankee Springs Time Trial
  • Running Races
    • Al Kayner’s St. Patrick Day Race
    • Bastille Day
    • Chad Schieber Memorial Run
    • Cheesefest
    • Cornstalk
    • Country Music Marathon
    • Crim
    • Dow Run/Walk
    • Free Press International Half
    • Frozen Blueberry Run
    • Independence Day 5K
    • Kate’s Challenge
    • Loon’s Pennant Race
    • Mud Creek Crawl
    • Operation Haitian
    • Pig Gig
    • Relove Haiti
    • Showboat River Run
    • Susan G. Komen Race for the Cure
    • Tawas Kiwanis Run By the Bay
    • Turkey Trot
    • Volksläufe
    • Walleye Fest
  • Triathlon
    • Alpha Delta Pi-athlon
    • Big Fish Triathlon
    • Bowling Green Triathlon
    • Caseville Triathlon
    • Holly Rec Triathlon
    • Holly Triathlon
    • Iron Nugget
    • Music City Triathlon
    • Old Hickory Lake
    • Rev3 Cedar Point
    • Rev3 Knoxville
    • Tawas Festival of Races
    • The Experience @ Frankenmuth
    • Tri For Life

So, we finally decided to build us a deck! What started to be a simple
project of a deck with an octagon (stop sign for all of you who forgot
your geometry 😉 ) in it, pretty much became the deck project from hell.
We hired a construction company to pour the posts and frame the deck in.
Once they had their part done, I ordered the decking material. Little did
I know we wouldn’t have quite enough material to finish the deck (mostly
Home Depot’s fault), but at this point I was getting pretty excited! The
material was in at Home Depot, so I called my dad and told him he should
come up the next weekend to help get this thing done. The decking came, my
dad was here, we were ready to begin, well almost, we had to of course hit
Pat’s on a beer run.

We started hauling the decking into the backyard. The guy who delivered
it was a pro fork-lift operator, but didn’t want to cut across the
neighbors lawn on the backside (come on… wuss). We started cutting the
boards at what we thought was the right angle to fit the octagon. After a
few cuts, many screws (who the hell invented a square-headed screw, that
was a bad idea!) we found out the boards weren’t landing on the octagon at
the right angle. Out comes the measuring tape, only to find out one side
of the octagon was a few inches shorter than the other sides. Even the
non-math types can tell you this is probably a bad thing. It was getting
late so we decided to pick up in the morning. The next day went a little
better, we ran to the hardware store and home depot about a dozen times,
got some boards down and compensated for the short-sided octagon.
Then, we ran into a design flaw in the plans where some boards weren’t
supported, so we had to put supports in… that slowed us down quite a
bit… After getting a few non-octagon boards down, we figured it be a
good idea to see how parallel the outside is to the house… We found out
it was off by an inch… that’s right 2.54 cm, 1/12 foot, 1/36 yard… an
inch off!? Luckily we were pro deck builders and compensated for such an
error, you can’t even tell the end doesn’t run parallel to the house.
Our next biggest issue was the sixteen foot board that ran next to the
house, that needed to be ripped and etched out for the back door. After
giving one board a shot on the table saw that was sitting on the ground,
we didn’t think it be possible to actually do that. Seeing as how there
was a board with a notch in the one side (see deck pictures), we thought
we’d try to rip that one. Somehow, we got that board cut, etched, and in
place, and it doesn’t just look good, it looks really good! We made a lot
of progress this day, even though we spent a couple hours at the shop
getting my dad’s truck to start. The mechanics were awfully chatty,
especially the tow-truck guy who stuck around to talk… er.. see if the
truck would start once the battery terminals were cleaned up.

After meeting up with my dad’s cousin after church, we were back on the
deck for a twelve hour day. We nearly finished the board laying part, and
decided to call it a day. There were only a couple boards to put down, and
I called in to tell my boss I’d be late for work. She told me to take a
personal day (a nice gesture until I found out what she had in store for
me later that week). We managed to get the octagon done along with the
rest of the boarding and it looked really good.

We (and when I say “we” I really mean Susan and Maria the Home Depot
deck consultant) decided it would be easier if we got railing kits, well I
tell you what, those railing kits are not fun to put in. We got one up and
it was pretty wobbly, until we thought we’d try two brackets for each 4×4
post. It added a little bit of stability to it, but not quite as much as I
would have liked to see. At this point it was getting dark again and we
didn’t have quite enough brackets anyway. The next day I had to go into
work, but when I got home we tried to put in an angled railing (that
didn’t go so well). With two railings up and half of a third one, I had to
leave the deck unfinished as I was “lucky” enough to get sent on a
business trip.

I thought the deck project was a project from hell… well that doesn’t
even compare to the fun I had in Alabama. We got onsite and started
getting ready to load our new phone system/software. We ran into issues,
and didn’t leave the central station until 1:00 AM CST. The next day
didn’t go much better, but we were running off the new stuff. To make
matters worse, the central station manager tried transferring files to a
server and one of the files were corrupt that was needed by the system. If
that wasn’t bad enough, Thursday early morning the station actually went
offline. That was bad, very bad! People’s lives depend on that station to
be up and running, any downtime could mean life or death. We found out, it
wasn’t anything to do with our new software (good for us), but it was a
LOT of long hours and little doing anything else. We also had to be on
site to see if something from our software would crash/error out.
At one point I was actually watching the central by myself (the shift
supervisor had left, my co-worker had left to get some sleep, it was me
and the operators). From what I observed over the past couple days, I was
actually able to answer the operators questions and help them through some
stuff, until the next shift supervisor finally showed up. The operators
were pretty nice (one of them even made me a pepperoni hot pockets and
gave me some chips, yeah my eating schedule was thrown completely out of
whack this week…) After trying to optimize his program as much as he
could, we determined the problems we were having was a networking issue
and managed to get it resolved (two IPs, one card, windows server, bad
idea in my opinion). Saturday night was the first night I actually got to
relax this week, and it felt kind of nice. I ended up hitting the jacuzzi
to make it even better before I have to go home and face the project I
left behind and my loving wife (who was none too happy when we had to stay
a couple extra days to get this crap working… maybe a blog entry will
put a smile on her face, a few days later than expected 🙂 )

August 17, 2009 |   deckjobtrip |   Leave a Comment

No Comments on “”

Leave a Reply

Archives

  • June 2025
  • November 2023
  • October 2023
  • November 2020
  • September 2020
  • August 2019
  • July 2019
  • November 2018
  • October 2018
  • September 2017
  • June 2017
  • May 2017
  • April 2017
  • June 2016
  • April 2016
  • March 2016
  • February 2016
  • November 2015
  • August 2015
  • July 2015
  • June 2015
  • May 2015
  • March 2015
  • February 2015
  • October 2014
  • May 2014
  • March 2014
  • February 2014
  • January 2014
  • December 2013
  • November 2013
  • October 2013
  • September 2013
  • August 2013
  • March 2013
  • January 2013
  • December 2012
  • November 2012
  • October 2012
  • April 2012
  • December 2011
  • October 2011
  • August 2011
  • July 2011
  • June 2011
  • May 2011
  • April 2011
  • August 2010
  • June 2010
  • April 2010
  • March 2010
  • August 2009
  • July 2009
  • August 2008
  • June 2008
  • May 2008
  • April 2008
  • March 2008
  • February 2008
  • January 2008
  • December 2007
  • November 2007
  • October 2007
  • September 2007
  • August 2007
  • July 2007
  • June 2007
  • May 2007
  • April 2007
  • March 2007
  • February 2007
  • January 2007
  • December 2006
  • November 2006
  • October 2006
  • September 2006
  • August 2006

Tags

  • bike
  • birthday
  • camping
  • car
  • cat
  • class
  • deck
  • dog
  • food
  • football
  • games
  • heartrate
  • holidays
  • Isle Royale
  • job
  • lawn
  • movies
  • nutrition
  • P90
  • park
  • phone
  • projects
  • race
  • racquetball
  • running
  • scuba
  • triathlon
  • trip

Links

  • Beginner Triathlete
  • Jorge's 16 Wk Winter Plan
  • MMBA Forums
  • MTBR Forums

© 2026 John's Blog